bannerpc_ABC
Press release

Headway Logistics Coordinates With NYK For Successful Roro Operations At Laem Chabang Port, Completing Bus Delivery To Thailand

Tuesday, 22/09/2026, 14:57 GMT+7

Following the successful voyage of the dedicated Roll-on/Roll-off (Roro) vessel departing from Central Vietnam, Headway Logistics continues to demonstrate its international operational capabilities by coordinating with NYK to successfully manage the vessel’s arrival and cargo discharge operations at Laem Chabang Port, Thailand. This milestone marks the successful completion of the ocean logistics chain for the bus shipment, ensuring a smooth and reliable delivery for the customer.

To ensure the entire delivery and handling process was carried out smoothly and in compliance with the stringent requirements of the automotive logistics supply chain, Headway’s logistics professionals were directly on site in Thailand, monitoring every stage of the shipment.

Strengthening Partnerships and Aligning Operations at the NYK Laem Chabang Office

Prior to the vessel’s arrival at the port, representatives from Headway Logistics held a working session with representatives of NYK at the carrier’s Laem Chabang branch office. During the meeting, both parties thoroughly reviewed the shipping documentation and discussed the operational plan and unloading schedule in detail. Continuous and transparent information exchange between Headway and NYK played a key role in optimizing operational timelines and mitigating potential risks at the destination port.

HW01

(Headway Logistics representatives work closely with NYK at the carrier’s Laem Chabang office, Thailand)

Monitoring Progress and Coordinating Operations at the Terminal

The Headway team was present at the terminal area of Laem Chabang Port to observe the actual operations and monitor the progress. The team proactively coordinated with the terminal operations team to stay updated on the receiving plan, vehicle staging area and vehicle movement flow.

HW02

(The Headway team at the terminal, monitoring preparations for receiving the bus shipment)

Overseeing the Vehicle Unloading Process at the Port

The discharge of vehicles from a RoRo vessel requires careful handling and close coordination. As soon as the unloading operation commenced, representatives from Headway and NYK were on site to oversee the operation. Each bus was safely driven from the RoRo vessel’s vehicle deck to the terminal yard by professional drivers. Headway’s presence at this stage enabled the team to directly observe the operation and document the condition of the vehicles following the long sea voyage, providing the customer with complete visibility and assurance throughout the delivery process.

HW03

(Headway and NYK representatives oversee the unloading of vehicles from the RoRo vessel onto the terminal yard)

Successfully Completing the Vehicle Delivery Operation

Meeting the stringent requirements of Roll-on/Roll-off (RoRo) transportation operations, the bus shipment was safely transferred to the designated staging area, successfully completing the delivery operation in Thailand.

HW04

(The electric bus shipment is safely staged at Laem Chabang Port, marking the successful completion of the delivery process)

The RoRo shipment not only opens up new opportunities for Vietnam’s automotive exports but also serves as a clear testament to Headway Logistics’ hands-on operational capabilities, dedication and professionalism. With its expertise in Automotive Logistics and a strong global partner network such as NYK, Headway is confident in delivering comprehensive, safe and optimized supply chain solutions for customers across international trade lanes.

Other news

Headway Logistics marks a new milestone in international freight forwarding by successfully coordinating, in cooperation with NYK Line, the first ...
September 18, 2026
Marking its third consecutive year accompanying Vietfish, Headway JSC returned to the 2026 exhibition, bringing specialized logistics solutions ...
August 28, 2026
Only 05 days to go until Headway and Tasco Insurance welcome our valued partners and customers at Vietfish 2026 – Vietnam’s leading international ...
August 14, 2026
Marking its third consecutive year of participation, Headway will once again join Vietfish 2026 from August 19–21, reaffirming its commitment as a ...
August 07, 2026
Continuing to demonstrate its expertise in specialized automotive logistics, Tasco Headway Logistics Group has successfully executed the ...
August 05, 2026
In June 2026, Headway continued to partner with its customer in executing a flooring export project to the European market, providing an end-to-end ...
June 29, 2026
In the first quarter of 2026, Headway JSC successfully transported more than 686 tons of Vietnamese durian to international markets, representing a ...
June 19, 2026
To enhance its project cargo capabilities and further expand its global logistics network, Headway participated in the INO Summit OPCA 10th AGM 2026, ...
June 12, 2026
In Q1/2026, Headway recorded the transportation of more than 15.000 tons of fresh Vietnamese bananas exported to Dalian Port, China, contributing to ...
May 28, 2026
As part of its strategy to expand its international network and develop a global logistics partnership ecosystem, Headway JSC will attend The ...
May 25, 2026

HEADWAY - HOCHIMINH OFFICE (HO)

  • HEADWAY - HOCHIMINH OFFICE (HO)
    44 Nguyen Van Kinh Street, Quarter 14, Cat Lai Ward, Ho Chi Minh City, Vietnam
  • HEADWAY - HOCHIMINH OFFICE (HO)
    (+84) 28 22 00 55 66/ (+84) 28 22 00 77 66

HEADWAY - HA NOI OFFICE

  • HEADWAY - HA NOI OFFICE
    03rd Floor, Lotus Building, No. 02 Duy Tan Street, Cau Giay District, Ha Noi City, Vietnam
  • HEADWAY - HA NOI OFFICE
    (+84) 24 3227 2123

HEADWAY - HAI PHONG OFFICE

  • HEADWAY - HAI PHONG OFFICE
    06th Floor, Hoang Phat Building, No 4 Lot 2A Le Hong Phong Street, Ngo Quyen Ward, Hai Phong City, Vietnam
  • HEADWAY - HAI PHONG OFFICE
    (+84) 225 730 0269

HEADWAY - DA NANG OFFICE

  • HEADWAY - DA NANG OFFICE
    No. 1 Le Dinh Ly Street, Thanh Khe Ward , Da Nang City, Vietnam
  • HEADWAY - DA NANG OFFICE
    (+84) 236 730 1068

HEADWAY - CHU LAI OFFICE

  • HEADWAY - CHU LAI OFFICE
    Nui Thanh Commune, Da Nang City, Vietnam
  • HEADWAY - CHU LAI OFFICE
    (+84) 235 650 6902

HEADWAY - DONG NAI OFFICE

  • HEADWAY - DONG NAI OFFICE
    670 Tay Lac Street, An Chu Hamlet, Binh Minh Commune, Dong Nai Province, Vietnam
  • HEADWAY - DONG NAI OFFICE
    (+84) 28 22 00 55 66

HEADWAY - QUY NHON OFFICE

  • HEADWAY - QUY NHON OFFICE
    01st floor, Viettel Gia Lai Building, No.1 Dinh Bo Linh Street, Quy Nhon Ward, Gia Lai Province, Viet Nam
  • HEADWAY - QUY NHON OFFICE
    (+84) 256 2478 188

HEADWAY - THANH HOA OFFICE

  • HEADWAY - THANH HOA OFFICE
    05th Floor, Petroleum Building, No.38A Le Loi Avenue, Hac Thanh Ward, Thanh Hoa City, Vietnam
  • HEADWAY - THANH HOA OFFICE
    (+84) 28 22 00 55 66