
(Headway conducts an on-site assessment of plastic pipe production lines to develop optimized transportation solutions for the project.)
Over the past week, the Headway team carried out an on-site survey following the factory relocation project from Dong Nai to Dat Do, Ba Ria – Vung Tau. The visit aimed to evaluate the relocation progress while assessing plastic pipe products to support upcoming logistics planning.
Post-Relocation Factory Assessment
As part of the site visit, Headway conducted a comprehensive inspection of the production areas, manufacturing lines, and operational equipment systems. Following the relocation to Dat Do, the majority of the production infrastructure and machinery has been installed and is gradually being commissioned.

(Assessment of production progress, operational conditions, and equipment systems after relocation.)
Survey of Plastic Pipe Categories and Related Products
In addition to evaluating relocation progress, Headway also reviewed various product categories at the facility, including infrastructure plastic pipes, pipe fittings, and related engineering plastic products. These goods are expected to be distributed from the factory to dealer networks, distribution partners, and infrastructure projects.
During the survey, Headway recorded key operational parameters such as cargo dimensions, handling conditions, and technical requirements to support the development of suitable transportation solutions.

(On-site survey of plastic pipe categories at the staging and storage areas)
Building a Logistics Foundation for Future Projects
This on-site survey enables Headway to gain a clear understanding of the relocation progress while assessing cargo characteristics and handling conditions for upcoming projects. Based on these insights, Headway is well-positioned to develop optimized logistics solutions, ensuring safe and efficient transportation for various types of industrial cargo.

(Overview of plastic pipe production lines during Headway’s on-site survey)